NMDC Annual report 2024

 

  • NMDC Annual report 2024
  • NMDC produces around 45 MT of iron ore per annum and has the capacity to produce approximately 51 MT. With ongoing expansion plans, the company aims to reach a production capacity of around 67 MT in the next 2-3 years and set a target of achieving a mining capacity of 100 MT by 2030.  
  • NMDC has a commendable 16% market share in iron ore output
  • BY 2030 NMDC’s 100 million tonnes would account for a quarter of the ~ 430 million tonnes of raw material required to reach that target.  
  • Company’s highest-ever capital expenditure of Rs. 2,066 crores was expended towards capacity building in FY24, which was 17% north of the capex target, Rs. 1,769 crores. 
  • NMDC’s standalone net worth (post the demerger of NSL) crossed the Rs. 25,000 crore mark in FY24 reinforcing the company’s financial stability and its capacity to invest in growth and generate value for stakeholders.
  • NMDC’s major iron ore mines - Kirandul and Bacheli in Chhattisgarh, and Donimalai in Karnataka delivered their highest-ever annual production in company history. 
  • The bottlenecks in pellet production were also resolved leading to peak volume of 2.65 lakh tonnes pellet production in FY24, highest since the plant’s commissioning.   
  •  Investing in capacity expansion and new infrastructure to augment production capacity to 72 million tonnes from existing iron ore mines, while also developing the NCL (NMDC CMDC Limited) JV mines to contribute another 28 million tonnes. 
  • Leveraging on intrinsic strengths and constraint optimization are the two drivers for realisation of vision to achieve a 100 million tonnes production capacity by 2030  

Comments

Popular posts from this blog

Confidence Petroleum Forays into Hydrogen Cylinder Manufacturing

RSI Indicator for finding good value stocks?

Poonawalla Fincorp: I love stocks at 52L